Chapter 13
Unitary Method and Chain Rule
Find the value of one, decide more or less for every column, and most word problems of arithmetic open up.
The unitary method is the oldest tool in arithmetic: know the value of many, find the value of one, then find the value of as many as you like. It looks too simple to deserve a chapter, but this one habit sits quietly inside Ratio, Percentage, Time and Work, Speed and Partnership.
In this chapter you will do three things. First, build the unitary method properly, including the cases where money is given and quantity is asked. Second, learn to tell direct variation from inverse variation just by reading the question. Third, join several columns into one line, which is the chain rule, and then handle quantities that depend on squares or on two other quantities at once (compound variation).
The men, days, hours and work formula has its own place in the Time and Work chapter (Type 11, "The MDH formula"), along with food and ration problems. We do not repeat that type here. We use it only as one more example of a chain, and we add the cases it does not cover.
Before you write anything in any question of this chapter, ask one thing: *if the first quantity goes up, does the second go up (direct) or come down (inverse)?* Once you have answered that, the rest is plain multiplication and cancelling.
The unitary method: go down to one, then up to many
The unitary method has two steps: bring the quantity down to one, then go up to the quantity you want.
Radhika buys 6 pens for ₹90. What do 10 pens cost?
- Step 1 (to one): 6 pens cost ₹90, so 1 pen costs 90 ÷ 6 = ₹15.
- Step 2 (to many): 10 pens cost 15 × 10 = ₹150.
[[fig:0]]
The same thing as a picture: cut ₹90 into 6 equal blocks of ₹15 each. Ten such blocks make ₹150.
[[fig:1]]
Find the value of one first, then multiply by the number asked. This works because every pen is priced the same, so the cost grows in step with the number.
When the question gives money and asks for the quantity, the second step turns into a division. One pen is ₹15, so ₹150 buys 150 ÷ 15 = 10 pens.
Two habits will save you marks. Keep like with like in each line: cost with cost, distance with distance. And change the units first (a dozen into 12, hours into minutes) and only then divide.
Direct and inverse variation: telling them apart
Two quantities are linked in one of two ways.
Direct variation (more–more, less–less). When one quantity doubles, the other also doubles. Their ratio stays fixed: CostNumber of pens is the same whether you buy 2 pens or 20. On a graph such a pair lies on a straight line through the origin.
Inverse variation (more–less). When one quantity doubles, the other becomes half. Their product stays fixed: men × days is the same for the same job. On a graph the points lie on a curve that falls as you move to the right.
[[fig:0]]
To decide, ask a one-line test: if I double the first, what happens to the second? It doubles: direct. It halves: inverse.
| Direct | Inverse | |
|---|---|---|
| Change | both rise or both fall | one rises, the other falls |
| Fixed | ratio yx = k | product xy = k |
| Examples | cost and quantity, distance and fuel | men and days, speed and time |
[[fig:1]]
Not every pair varies in either way. If a charge has a fixed part, as in a taxi fare with a starting amount, the pair is not in direct proportion, because zero distance does not give zero fare. In this chapter the question itself tells you that the rate is steady: "at the same rate", "uniform speed", "equally efficient".
The more–less rule: write the setup in one line
Most slips in this chapter are slips of direction, not of arithmetic. The more–less rule takes care of that. Write the given case in one row and the asked case in the next. For every column other than the unknown, ask: does this column make the answer more or less?
Take this: 4 printers print 800 sheets in 5 minutes. How long will 6 printers take to print 1,200 sheets?
- Printers 4 → 6: more printers work faster, so the time becomes less. Multiply by 46.
- Sheets 800 → 1,200: more sheets need more time, so the time becomes more. Multiply by 1200800.
Time = 5 × 46 × 1200800 = 5 minutes.
[[fig:0]]
The rule for the fraction is short. If the column pushes the answer up, put the bigger number on top. If it pushes the answer down, put the bigger number at the bottom. Decide the direction column by column, never for the whole question at once.
Two assumptions sit behind every such question: all workers (or articles) are alike and work (or are priced) at the same rate, and nothing else changes except the columns you have written down. If the question changes something else, add a column for it.
Type 1
Unitary method: value of one, then of many
This is the foundation idea put to work. Whatever the question gives you, bring it down to one unit of the thing that is asked about, and then build up.
Formula: Quantity for money M = MPrice of one unit
A scooter runs 45 km on 3 litres of petrol. One litre gives 45 ÷ 3 = 15 km, so 7 litres give 15 × 7 = 105 km.
[[fig:0]]
Now turn the question round. If the money is given and the quantity is asked, you divide in the second step. Radhika pays ₹96 for 8 kg of potatoes, so 1 kg costs ₹12. With ₹156 she can buy 156 ÷ 12 = 13 kg.
[[fig:1]]
Many questions need two or three hops. "Distance per litre is known, petrol price is known, find the cost of a trip" means km → litres → rupees. Write each hop on its own line and keep the units with every number. You will never multiply where you should divide.
Units first. A dozen is 12, a score is 20, 1 hour is 60 minutes, 1 kg is 1,000 g. Change everything into the same unit before the first division. A machine rate given per minute and a time given in hours is the most common slip in this type.
You do not always need the value of one. If the asked quantity is a simple multiple of the given one (32 litres is 8 times 4 litres), multiply straight away. The unitary method is the safe road; the multiple is the short cut when it is visible.
Formula: Value of one = Given valueGiven number
Value of n = Value of one × n
- A car covers a distance of 45.6 km in 2.4 litres of petrol. How much distance will it cover in 1 litre of petrol?
- If a car covers 90 km using 4 litres of petrol, how much distance (in km) will it cover using 32 litres of petrol?
- If 4 lines of a print, in a column of a book, contain 36 words, how many words will a column of 50 lines contain?
- If 4 lines of a print, in a column of a book, contain 63 words, how many words will a column of 52 lines contain?
- A large ship consumes 0.2 litres of fuel per km, and a smaller ship consumes 0.15 litres per km. If the large ship travels 500 km and the…
Type 2
Direct variation in word form — the ratio stays fixed
When a question says directly proportional, varies directly or at the same rate, it is telling you that the ratio of the two quantities does not change.
If y ∝ x, then yx = k, a fixed number. So y1x1 = y2x2, which means y2 = y1 × x2x1. You multiply the old answer by the new-to-old ratio of the other quantity.
Formula: y ∝ x ⇒ yx = k ⇒ y1x1 = y2x2
New value = Old value × New quantityOld quantity
[[fig:0]]
Look at the table in the figure. Quantity goes from 4 to 8 (× 2), so cost goes from 60 to 120 (× 2). Quantity goes from 8 to 12 (× 1.5), so cost goes from 120 to 180. Down every column, cost ÷ quantity is 15.
This one idea covers many settings:
- Maps and scale. 2 cm stands for 5 km, so 9 cm stands for 5 × 92 = 22.5 km. For an area on the map, both length and breadth are scaled, so area is scaled by the square of the map ratio.
- Parts of a whole. If 34 of a drum holds 30 litres, the whole drum holds 30 ÷ 34 = 40 litres, and 12 of it holds 20 litres.
- Exchange. "7 pens cost the same as 4 diaries" gives a fixed ratio of prices. Change everything into one item, then use the unitary method.
- Groups in the same proportion. If 6 apples and 4 mangoes cost ₹150, then 3 apples and 2 mangoes (exactly half of each) cost ₹75. You do not need the price of either fruit.
Formula: Map: actual length = map length × scale; actual area = map area × scale2
Before you use the rule, make sure both quantities really rise together in the same proportion. A taxi fare with a fixed starting charge rises with distance, but it is not directly proportional to it, because the ratio changes.
Type 3
Inverse variation in word form — the product stays fixed
In inverse variation one quantity goes up exactly as fast as the other comes down, so their product never changes.
If y ∝ 1x, then x × y = k. So x1 y1 = x2 y2, and y2 = y1 × x1x2. Notice the fraction is now old-to-new, the opposite of direct variation.
Formula: y ∝ 1x ⇒ xy = k ⇒ x1 y1 = x2 y2
[[fig:0]]
The rectangles in the figure have the same area, 60. Make one side half as long and the other side must become twice as long. Every inverse question is this picture in disguise. Ask yourself what the fixed "area" is:
- Men and days for the same job. Men × days is fixed (the total work). Fewer men, more days.
- Speed and time for the same distance. Speed × time = distance, which is fixed.
- Price and quantity for the same money. Price × quantity = money spent. A higher price buys less.
- Rows and seats for the same hall. Rows × seats per row = total seats.
- Size of one piece and number of pieces. A rope of fixed length, a floor of fixed area: bigger pieces, fewer of them. For square tiles, the area of one tile is side2, so the number of tiles goes with the inverse of the square of the side.
- Wheels. Revolutions × circumference = distance. A wheel of double radius turns half as many times.
Formula: Square tiles: N1 × a12 = N2 × a22 ; wheels: n1 r1 = n2 r2
The Time and Work chapter works with men and days in full detail. Here the point is to recognise the fixed product in any setting, even when the words "inversely proportional" never appear in the question.
When a question asks "by how much must it increase", find the new value first and then subtract the old one. Many students stop at the new value.
Formula: New value = Old value × Old quantityNew quantity
- If 6 men can complete a work in 16 days, how many men are required to complete the same work in 12 days?
- 16 men can complete a work in 15 days. How many men are required to complete the same work in 10 days?
- If 8 workers can build a wall in 10 days, how many days will 4 workers take to build the same wall?
- If 9 workers can build a wall in 12 days, how many days will 6 workers take to build the same wall, assuming they work at the same rate?
- A camp has provisions for 48 persons for 12 days. In how many days will the same provisions finish off if the strength of the camp is…
Type 4
Inverse variation after a change midway — provisions and stock
A stock of food, fodder or fuel is a fixed amount, and the people (or animals) using it decide how long it lasts. More eaters, fewer days. That is inverse variation, and the fixed product is eaters × days.
The man-days formula for food questions is taught in the Time and Work chapter (Type 11, "The MDH formula"). Here we look at the same stock with the more–less view, which is quicker when the group changes in the middle.
Step 1. Use up the days that have passed. If food was for 40 days and 10 days have gone, the food left is enough for the same group for 30 days. This step is the whole question; most wrong answers skip it.
Formula: Food left after t days = enough for the same group for (D − t) days
Step 2. Change the group. Now only the people change. More people means fewer days, so multiply the remaining days by old groupnew group.
Formula: New days = (D − t) × Old groupNew group
[[fig:0]]
In the figure, 90 men have food for 40 days: 3,600 man-days. After 10 days, 900 man-days are used and 2,700 are left. If 30 men leave, 60 men share 2,700 man-days, which is 45 days. With the ratio: 30 × 9060 = 45 days.
Two more settings come up:
- Reinforcements. If extra people arrive and the food now lasts a given number of days, find the new group from the product, then subtract the old group.
- Cutting the ration. If the same people must make the food last longer, each person's daily share must fall in the inverse ratio of the days. From 30 days to 40 days, the share becomes 34 of the old share, which is a cut of 14.
Formula: Same food, more days: new daily ration = old ration × Old daysNew days
When the group changes twice, repeat Step 1 and Step 2 for each phase, one after the other.
- 100 men have provisions for 27 days. If 25 men have left, for how many days the same provisions would last for the remaining men?
- There are 1000 men in a group. They have food for 60 days. After 10 days, 500 men left the group. For how many days will the remaining…
- A military camp has provisions for 360 soldiers for 50 days. After 10 days, 120 more soldiers arrive at the camp. Assuming the daily…
Type 5
Chain rule with direct columns — output, cost and wages
The chain rule joins several proportions into one line. When three or more quantities are linked, change one column at a time and multiply the effects.
Formula: Chain line: Answer = Old answer × (fraction for column 1) × (fraction for column 2) × …
In this type the unknown is an output: bags made, fodder eaten, milk given, money earned or a bill paid. For such an unknown, almost every other column works in the same direction. More workers make more bags; more days also make more bags. So every fraction has the bigger number on top when that column increases.
Formula: Q1M1 D1 H1 = Q2M2 D2 H2 (Q = output, bill or wages)
10 workers make 30 bags in 3 days. How many bags will 20 workers make in 6 days?
- Workers 10 → 20: more workers, more bags. × 2010
- Days 3 → 6: more days, more bags. × 63
Bags = 30 × 2010 × 63 = 120.
[[fig:0]]
The same result comes from the unitary method in steps: 1 worker makes 3 bags in 3 days, so 1 bag a day; 20 workers in 6 days make 20 × 6 = 120 bags. The chain line does all the steps at once.
As a formula, when output Q depends directly on M and D (and H, if hours are given):
Q1M1 × D1 × H1 = Q2M2 × D2 × H2
Wages and bills are outputs too. A mess bill grows with the number of students and with the number of days. Earnings grow with persons, hours a day and days. If a rate is "per person per day", the bill is people × days × rate, which is exactly this chain.
Formula: Bill = persons × days × rate per person per day
Sometimes the unknown is not the output but one of the inputs (how many typists are needed). Then that column is the answer and the output column becomes a direction question: more pages need more typists, less time needs more typists. That mixed case is the next type.
Type 6
Chain rule with mixed columns — the more–less rule on work
Now the unknown is an input: days, men or hours a day. Some columns push the answer up and some push it down, and you must decide each one separately.
The full men–days–hours–work formula, M1 D1 H1W1 = M2 D2 H2W2, is taught in the Time and Work chapter (Type 11, "The MDH formula"). Both methods give the same answer. The more–less line is handy when the unknown sits in the middle of the formula, or when one column (such as the work) is given as a fraction or a multiple.
Formula: M1 D1 H1W1 = M2 D2 H2W2 (see Time and Work, Type 11)
More–less: column raises the answer ⇒ biggersmaller; column lowers it ⇒ smallerbigger
[[fig:0]]
Read the figure as a balance. On the left, 12 men working 10 days of 8 hours finish 1 job. On the right, an unknown number of men work 15 days of 4 hours on 2 jobs. Both sides must give the same men × days × hours per job: 12 × 10 × 81 = M × 15 × 42, so M = 32.
Now the more–less way. 6 men finish a job in 20 days working 8 hours a day. How long will 8 men take for double the job, working 6 hours a day?
- Men 6 → 8: more men, fewer days. × 68
- Hours 8 → 6: fewer hours a day, more days. × 86
- Work 1 → 2: more work, more days. × 21
Days = 20 × 68 × 86 × 2 = 40.
[[fig:1]]
Workers of two kinds. If 3 men or 5 women can do a job in 24 days, then 3 men = 5 women in working power. Change everyone into one kind and then use the inverse rule. 3 men + 5 women = 3 men + 3 men = 6 men, which is double the original 3 men, so they need 24 ÷ 2 = 12 days.
Formula: a men or b women do a job ⇒ a men = b women (in working power)
Work given as a fraction. "Half the work" means the work column goes 1 → 12. "Thrice the work" means 1 → 3. Write it as a column like any other.
- 38 men can do a piece of work in 10 days. Find the time required by 10 men to do thrice the work.
- 24 men can complete a work in 90 days. 36 men will complete 50 percent of the same work in how many days?
- 50 men can build a wall in 30 days working 6 hours per day. How many men will be required to build the same wall in 45 days working 4…
- 15 men can complete a work in 40 days. How many men can complete (1/2) part of the same work in 20 days?
- A contractor agreed to complete a job in 74 days. He employed 21 men to work, but only one-fourth of the work was completed in 32 days.…
Type 7
Compound variation — squares, roots and the constant k
Sometimes a quantity depends on the square (or square root) of another, or on two quantities at once. The words tell you exactly how.
- "y varies directly as x" ⇒ y = kx
- "y varies inversely as x" ⇒ y = kx
- "y varies as the square of x" ⇒ y = kx2
- "y varies as the square root of x" ⇒ y = k√x
- "y varies directly as x and inversely as z" ⇒ y = kxz
Method 1: find k. Put the given values into the equation, find k, then use the same k for the new values. If y varies as x2 and y = 12 when x = 2, then 12 = k × 4, so k = 3. When x = 5, y = 3 × 25 = 75.
Formula: y ∝ xn ⇒ y2y1 = (x2x1)n ; y ∝ 1xn ⇒ y2y1 = (x1x2)n
y ∝ xz ⇒ y = kxz; find k from the given values
[[fig:0]]
Method 2: ratio. Skip k and compare the two situations directly: y2y1 = (x2x1)2. Here x goes 2 → 5, so y goes × 254: 12 × 254 = 75. For two variables, multiply the effects, exactly like the chain rule.
[[fig:1]]
Breaking into pieces. If the value of a stone varies as the square of its weight, breaking it always lowers the total value, because the squares of the parts add up to less than the square of the whole. A ₹36,000 diamond broken into two pieces in the ratio 1 : 2 has pieces worth (13)2 and (23)2 of the original, that is 19 and 49. Together they are worth 59 × 36,000 = ₹20,000, a loss of ₹16,000.
Formula: Value ∝ weight2, pieces a : b : … ⇒ total value of pieces = a2 + b2 + …(a + b + …)2 × original
For a pizza priced by area, area varies as the square of the diameter. Doubling the diameter makes it four times as costly, not twice.
Type 8
Inverse variation with percentages — price, quantity, speed and time
When the product of two quantities is fixed (price × quantity = money, speed × time = distance, wage × workers = budget), a percentage change in one forces a fixed change in the other. Write the change as a fraction and flip it.
[[fig:0]]
In the figure, the price falls by 20%, so it becomes 45 of the old price. The same money then buys 54 of the old quantity, which is 25% more. The rule in fraction form:
- If one quantity rises by 1n, the other falls by 1n + 1.
- If one quantity falls by 1n, the other rises by 1n − 1.
Formula: Rise of 1n in one ⇒ fall of 1n + 1 in the other; fall of 1n ⇒ rise of 1n − 1
So a rise of 3313% (13) in price means 25% (14) less sugar for the same money.
Extra quantity for the same money. "A reduction of 10% lets a buyer get 2 kg more for ₹450." The 10% saved is ₹45, and it buys the extra 2 kg at the new price. New price = 45 ÷ 2 = ₹22.5 per kg. Original price = 22.5 ÷ 0.9 = ₹25 per kg.
Formula: Reduction r% gives q kg more for ₹M ⇒ new price = r% of Mq; original = new price1 − r/100
Speed and time. If speed rises by 15 (20%), time falls by 16. If that saves 20 minutes, 16 of the usual time is 20 minutes, so the usual time is 2 hours.
Formula: Speed up 1n ⇒ time down 1n + 1; saved time = 1n + 1 × usual time
Keeping expenditure the same. If the price rises by r%, consumption must fall by r100 + r × 100%. This is the same flip rule written with percentages.
Formula: Price up r% ⇒ consumption down r100 + r × 100% (same expenditure)
These questions also sit in Percentage. Here the idea to see is that they are inverse variation: the product is fixed, so the factors move in opposite ratios.